• 澳门人·威尼斯(中国)官方网站

    SOLUTIONS&CASES
    解决方案&案例
    Shanghai Laogang Comprehensive Landfill Leachate Treatment Project
    Background
    Shanghai Laogang MSW comprehensive utilization base is located in the east of Laogang Town, Pudong New Area (formerly Nanhui District), about 70km to the southeast of Shanghai downtown. It is connected to the Yangtze River Estuary in the north, 10km away from Pudong International Airport, Hangzhou Bay in the south, 10km away from new port city, and 16km away from Donghai Bridge.
    Scheme
    WELLE has provided 1600m m3/d incineration plant leachate + 6500 m3/d landfill leachate treatment system for Shanghai Laogang comprehensive landfill site. The main process is "(anaerobic) + external MBR + NF + RO". The effluent is stable and meets the discharge standard in Table 2 of Standard for Pollution Control of Domestic Waste Landfill (GB16889-2008).
    Achievements
    Laogang, as the main base of end-to-end disposal in Shanghai waste treatment system and the largest landfill in Asia, is responsible for 70% of MSW disposal tasks in Shanghai. It has been in operation for 30 years, from Phase 1, Phase 2, Phase 3 to Phase 4 of Sino foreign JV and then to phase 5 of comprehensive landfill disposal operation.
    其他项目案例
    友情链接: